Blue Bell Carpark Review

Projects & RefurbishmentBlue Bell Carpark D&M where tasked with resurfacing the Blue Bell carpark with smooth new tarmac. The task had risen when D&M where called to bring the Blue Bell car park back to life. This includes the full carpark being being re-tarmaced and resurfaced, as well as new bays being correctly lined by…

Manor Farm

Projects & RefurbishmentManor Farm D&M were tasked with a project which involved the removal and replacement of a staircase, including decking with handrails and refix yellow anti slip stair nosings. Due to the multiple stages involved with this case, engineers worked closely with the client to ensure that the specification was met to their exact…

Plumpton College

ElectricalPlumpton College D&M were tasked with a full LED changeover within the stable, sports hall and residential blocks from the current fluorescent tube installation. The works were required to be completed within a very small window of opportunity for the client due to ongoing teaching and residential courses being held at the college and with great…

Listed Pub

Projects & RefurbishmentListed Pub D&M were required to uplift a small area of T&G 18mm Oak flooring in the bar area and replace it like for like in the listed building. The project started off with the removal of the existing flooring. Once this task was completed a few complications occurred as the subfloor had…

Utility Supplier, Hove

Utility Supplier, Hove For this case, D&M group were approached by a client in Hove and were tasked with the installation of bespoke Daikin VRV systems within the new call centre. As per our usual routine we met with the client to discuss their specific needs and review the project site.                                                                         However, we like to…

Utility Supplier, Barnwood

Mechanical ServicesUtility Supplier, Barnwood For this case, D&M Group were approached by a client in Barnwood, tasked with both the supply and Installation of three Carrier Heat Pump Chillers, complete with Crane lift for a Business-Critical Data Centre. Upon our consultation meeting with our client, they had outlined their preferred timeframe of six weeks. In…

Shipping Company, London

Projects & RefurbishmentShipping Company, London For this particular case, D&M Group were tasked with providing a full fit-out inclusive of mechanical and electrical services to a high-end shipping company based in Central London. Due to the high demand of this project our engineers worked meticulously to both plan and schedule all the works required in…

National Pub Chain, Wigan

AirconditioningNational Pub Chain, Wigan This project in particular was very complex, our D&M staff were tasked with the removal of existing 30-year-old full fresh air AHU and associated condensers, which was to be completed in normal working hours, all whilst the pub continued to trade throughout. As such, extensive planning and preparation was made to…

Hotel Chain County Hall

MechanicalCounty Hall For this case, D&M worked with one of the UK’s largest Hotel chains in one of the most prestigious locations, County Hall – which is the place to be during Christmas and New Year. Unfortunately, our client’s boiler plant failed on Christmas Eve (with a fully booked hotel!). As a result, D&M was…