Premier Inn Gatwick

MechanicalPremier Inn Gatwick With this case, D&M group was approached by the client and had the great opportunity to assist with the refurbishment of Premier Inn (Gatwick South). Our skilled professionals were tasked with replacing the existing isolation valves in every single bathroom throughout the hotel, which amounted to over 100 fittings. Likewise, Premier Inn…

Premier Inn Eastbourne

Project & RefurbishmentPremier Inn Eastbourne Called out in high winds to an unknown emergency D&M were tasked with managing and making safe a external brick skin that had come down due to high winds. After securing the site, D&M set about removing loose and excess brickwork and damaged structures. After facilitating structural engineers, D&M were…

Premier Inn Norwich

ElectricalPremier Inn Norwich The D&M electrical department was tasked with the installation of energy efficient security lighting for Premier Inn Norwich, specifically to the area located between the car park and the main entrance. This was to enhance the security of the area and to give safe adequate lighting for guests to move from the…

Manor Farm

Projects & RefurbishmentManor Farm D&M were tasked with a project which involved the removal and replacement of a staircase, including decking with handrails and refix yellow anti slip stair nosings. Due to the multiple stages involved with this case, engineers worked closely with the client to ensure that the specification was met to their exact…

Plumpton College

ElectricalPlumpton College D&M were tasked with a full LED changeover within the stable, sports hall and residential blocks from the current fluorescent tube installation. The works were required to be completed within a very small window of opportunity for the client due to ongoing teaching and residential courses being held at the college and with great…

Listed Pub

Projects & RefurbishmentListed Pub D&M were required to uplift a small area of T&G 18mm Oak flooring in the bar area and replace it like for like in the listed building. The project started off with the removal of the existing flooring. Once this task was completed a few complications occurred as the subfloor had…

Brewers Fayre Farm

ElectricalBrewers Fayre Farm   For this case, D&M Group’s electrical department was tasked recently with installing new car park lighting at the Brewers Fayre Hop Farm restaurant. Due to the restaurant’s location there was a lack of suitable lighting. The object of the works was to provide suitable lighting for the safety and security of…

Utility Supplier, Hove

Utility Supplier, Hove For this case D&M were tasked with installing bespoke Daikin VRV systems within the new call centre. However, this project was not your average Air Conditioning Installation; due to the new Mezz floor the ceiling heights were too low for cassettes or ducted type FCU’s, which proved to be a potential challenge.…

Utility Supplier, Barnwood

Mechanical ServicesUtility Supplier, Barnwood For this case, D&M were tasked with the supply and Installation of three Carrier Heat Pump Chillers complete with Crane lift for a Business-Critical Data Centre. Due to the nature of the project, D&M staff worked meticulously with planning and execution until they were able to supply the client with the…