Premier Inn Eastbourne

Project & Refurbishment Premier Inn Eastbourne Called out in high winds to an unknown emergency D&M were tasked with managing and making safe a external brick skin that had come down due to high winds. After securing the site, D&M set about removing loose and excess brickwork and damaged structures. After facilitating structural engineers, D&M…

Crossbush, Arundel

Electrical Crossbush, Arundel D&M were tasked with a full external decoration, replacement and repair of windows and doors and landscaping works – all whilst the premises stayed open to customers. Customer safety was paramount and, thanks to close communication with management, maintained throughout the works. Upon completion the feedback was exceptionally positive with the premises…

Premier Inn Norwich

Electrical Premier Inn Norwich D&M electrical department recently installed energy efficient security lighting to the Premier Inn Norwich to the area between the car park main entrance. This was to enhance the security and to give safe adequate lighting for guest to move from the car park to the entrance at times of darkness.

Manor Farm

Projects & Refurbishment Manor Farm Supply and install new purpose made staircase and decking with hand rails and paint to match existing and refix yellow anti slip stair nosings Barrier off work area and put sign on door. Cut out damaged external stairs, retaining top anti-slip edging/nosing. Dig out 2x timber posts in paving area.…

Plumpton College

Electrical Plumpton College The Challenge: Tasked with a full LED changeover within the stable, sports hall and residential blocks from the current fluorescent tube installation. The works were required to be completed within a very small window of opportunity for the   client due to on going teaching and residential courses being held at the college and…

Listed Pub

Projects & RefurbishmentListed Pub Uplift a small area of T&G 18mm Oak flooring in the bar area and replace like for like in listed building. No intrusive survey was possible prior to commencing works as this is a working pub. Once existing flooring was lifted it became clear that the subfloor had failed. The area…

Brewers Fayre Farm

Electrical Brewers Fayre Farm Electrical department recently installed new car park lighting at the Brewers Fayre Hop Farm restaurant to improve the safety and security for the patrons and staff of the restaurant. Through the use of scissor lifts our IPAF qualified engineer removed the original fittings and replaced with new.

Utility Supplier, Hove

Utility Supplier, Hove Bespoke Daikin VRV systems within new call centre. This project was not your average Air Conditioning Installation. Due to the new Mezz floor the ceiling heights were too low for cassettes or ducted type FCU’s. The decision was made to use floor standing units, however, we still had to overcome the problem…

Utility Supplier, Barnwood

Mechanical Services Utility Supplier, Barnwood [/vc_column_inner] Supply and Installation of 3 x Carrier Heat Pump Chillers complete with Crane lift for Business Critical Data Centre. Works included all new steel pipework, insulation, controls, electrical and site management over a very harsh winter period.