For this client, D&M group were given a 3 week time scale to install and fit an underground workshop/garage. The space was transformed with a new power source to make it a functioning environment. Data points were also mounted into the walls, providing a network infrastructure. D&M also equipped the space with various features such as an EV charger (electric vehicle), electrical garage door supply with controls, welding units and a fire alarm. LED lighting with microwave control capable of detecting movement was also installed.
The project was completed within the given time-frame, fully satisfying the client requirements.