At D&M Group, we are currently working with a new client who is developing a prestigious high end hotel in a prime location in Central London. Having had several meetings, our team have been working closely with the client to create a plan and schedule for works. The current phase involves the installation of AC pipework throughout the hotel within designated risers and to a very stringent specification and layout. As a result of the diligence, dedication and hard work of our engineers, we are currently ahead of schedule and on cost. The client are very pleased with the positive attitude of our engineers whose application and flexibility has aided with the smooth and efficient running of the project. We wholly intend to maintain this momentum and ensure our client’s project is completed in a manner that encapsulates our clients vision.
We pride ourselves on the work ethic of all of our engineers and the overwhelming positive feedback speaks volumes for the quality of our work.